Super battery construction well underway
The first shipment of battery units for the Waratah Super Battery have arrived in Australia and are being shipped from the Port of Newcastle to the construction site at the…
The first shipment of battery units for the Waratah Super Battery have arrived in Australia and are being shipped from the Port of Newcastle to the construction site at the…
EnergyCo has prepared a comprehensive Environmental Impact Statement (EIS) for the Waratah Super Battery project at the former Munmorah power station. It’s a 212-page document, along with hundreds of pages…
Planning is underway for a 1.65 GW floating offshore wind farm to be located between The Entrance and Newcastle with a drop-in information session to be held on November 8….
The site of the former Munmorah Power Station has been formally identified as the ideal location for the 700MW Waratah Super Battery, according to Shadow Minister for the Hunter and…
Member for Swansea and Shadow Minister for the Hunter, Yasmin Catley, is calling on the NSW Government to install the state’s new super battery at the old Munmorah power station…
The demolition of the Munmorah Power Station is moving ahead with the massive blast event demolishing the remaining boiler house. The explosive demolition was originally planned for September but is…