Planning panel meeting deferred

An artist's impression of how the theatre will look

A meeting of the Local Planning Panel in May was deferred for procedural fairness over plans for the redevelopment of Avoca Beach Theatre, with no date yet set for a rescheduled meeting.

Current plans for the redevelopment were not included in the agenda papers for the May 16 meeting until the day of the meeting and it was not clear if the public had seen those latest plans on the Central Coast Council website.

It also appeared Council had not followed its own procedures for the site as outlined in its Central Coast Local Environment Plan (LEP).

Local Planning Panel Chair Kara Krason said there was a lack of certainty that reasonable notice had been given to interested members of the public.

The Panel requires all people who have made written submissions to be notified a week before the Panel meeting.

The Panel said the business papers did not include a copy of the current set of proposed plans which the Panel was advised had not been notified.

“Accordingly, to ensure procedural fairness and compliance with the relevant direction and guidelines are achieved, the Panel postponed hearing from speakers and considering this matter until all such matters had been satisfactorily met,” the Panel Minutes said.

The applicant’s team, which included a line-up of speakers to address the Panel, joined the online meeting about 12 minutes late and missed the entire explanation for why the matter was being deferred.

Krason explained a second time.

The Minutes show the future meeting the Panel was expecting: a full set of the final proposed plans and original Land and Environment Court (LEC) approved plans from the Court’s 2017 decision; all supporting documentation referenced in the assessment report and draft conditions, including the original conditions issued when the LEC granted consent for the development; and a detailed assessment of the current application against the original approval.

“This should include but not be limited to key matters of building height, FSR, (floor space ratio) car parking, view loss, urban design and architectural quality,” the Minutes said.

The Panel also requires confirmation that an updated view-impact assessment was based on an assessment from all previously identified view-impacted residences against the current set of proposed plans and that no additional properties would be significantly impacted by the proposed modification, beyond those previously considered acceptable by the LEC approval.

Council is also required to: correct all reporting errors in the report in relation to proposed FSR and height numerical figures and percentages and associated commentary regarding compliance and non-compliance; clarify whether a VPA (voluntary planning agreement) applies to the site given inconsistencies in reporting between the consultant documentation, Council’s assessment report and the briefing; confirm if the proposed modification plans require re-notification having due regard to the public interest and whether people who lodged a submission (either for or against) are re-notified in accordance with Council’s notification policy.

Council is to ensure that all people who lodged a submission receive notice of the date and time of the public meeting at least the week prior and confirm that the proposed plans and all documentation submitted following the initial notification of the modification application have been uploaded to Council’s website and are available for public viewing.

The panel noted that Council’s architect had significant concerns with the proposed modified design and that the matter has not been before a design review panel, which is a provision for the site as written up in the LEP.

The latest plan for the 69 Avoca Dr site attracted 273 submissions in support and 59 against.

In 2017, the LEC approved demolition of a house on the block next door and construction of a part two, part three-storey building to the north and east of the existing theatre to provide a commercial and residential building containing four cinemas, a terrace, a cafe/gallery and five apartments.

Proposed amendments to the approved design include a height increase of 0.245m; a plant room added to the basement level carpark; seating reduced by 154 seats to a total of 462 seats, solar on the roof; a residential foyer on the second floor and one on the first floor.